Schema

<< Click to Display Table of Contents >>

Navigation:  Calculations > Protection > Protection for Enexis >

Schema

Schedule generation is started with: Calculate | Security | Enexis | Schematic.

The presence of a pdf printer is necessary. This is a printer with 'pdf' in its name.

The name of the pdf file to be generated is requested.

 

The first sheet contains the transport node.

The following sheets contain one transport node or transport station and the distribution network behind it, transformed into a waterfall diagram.

A node behind an open switch may be drawn several times.

 

For now, the text shown is fixed and based on a view with:

Node: name, short name and blades

Branch: name, fields, cable length andItoe

Element: type name

Switch and security: type name and long setting

 

Some text positions are automatically adjusted:

branch (fields): on the outside of a vertical rail

switch: above a horizontal cable

measurement field: below a horizontal cable

 

All text sizes (except of a link) are set to 30.

 

An IEC-60909 calculation is performed automatically beforehand.

This allows single-phase and three-phase short-circuit currents to be put at the ends of routes in the diagram.

Ik,3f in kA. Ik,1f in A.